Ninth Line Fire Station project is my lastest design project from Studio 4 class.
The building is to be sprinklered, of non-combustible construction, OBC classification Group D for the staff / admin. side,
Group F3 Low Hazard for the Apparatus Bay, will be 1 storey and having 3 trucks.
4/2022 |